Home > Solution > Children playground

Construction process and significance of multi-connected air-conditioning project of Henan Able Trading Co.

DATE:2025-02-18 11:54:01
Read:
SHARE:
Recently, Henan Able Trading Co., Ltd. successfully won the bidding of a multi-connected air-conditioning installation project in an amusement park in the Philippines, which is not only an affirmation of the company's technical strength, but also an important step in the company's internationalization strategy. The construction process and significance of the project are described in detail below.
I. Construction Process
Construction Preparation Stage
Before the construction started, the team of Henan Aibo Trade Co., Ltd. made full preparations. First, they carefully studied the construction drawings, clarifying the layout of the air conditioning system, the location of the indoor and outdoor units, the direction of the pipeline and other information. Subsequently, the team conducted a detailed survey of the construction site, cleaned up the debris at the installation location, and checked the load-bearing capacity of the installation site to ensure that the installation space met the requirements. At the same time, according to the project requirements, they prepared the required materials, such as copper pipe insulation, power lines, signal lines, etc., as well as installation tools, such as vacuum pumps, pressure gauges, reamers, wrenches, electric drills and so on.
Indoor unit installation stage
According to the design drawings, the construction team determined the installation location of the indoor unit and positioned and punched holes. They used a level to ensure that the installation position was level, then installed the boom in the punched holes and adjusted the height and level of the boom to ensure smooth installation of the indoor unit. After the lifting of the indoor unit was completed, they connected the drain pipe of the indoor unit and ensured that the drainage slope met the requirements to ensure that the condensate could be discharged smoothly.
Outdoor unit installation stage
During the installation of the outdoor unit, the construction team first poured a concrete foundation or installed metal brackets at the selected installation location. The foundation was leveled and solid, and the leveling error was strictly controlled within the specified range. Then they used a crane to lift the outdoor unit onto the foundation and bolted the outdoor unit to the foundation or bracket. During the installation process, they paid special attention to protecting the shell and internal parts of the outdoor unit from collision and damage. At the same time, vibration damping pads were installed between the outdoor unit and the foundation or bracket to minimize vibration and noise transmission during operation.
Piping and Electrical Installation Stage
Piping installation is an important part of air conditioning installation. The construction team accurately cut the copper pipes according to the distance and direction between the indoor and outdoor units, and processed the ends of the pipes by flaring and expanding them. Then, they used welding or flare connection to connect the copper pipe to the indoor and outdoor units, ensuring the welding quality and avoiding problems such as fluorine leakage. After the connection was completed, the copper pipe was insulated, with the insulation material wrapped tightly and the seams sealed with tape to prevent heat dissipation and condensation. During the electrical installation stage, they connected the power and signal lines to the electrical terminals of the indoor and outdoor units respectively in accordance with the design drawings and specification requirements to ensure a correct electrical connection.
System commissioning and acceptance stage
System commissioning is a key step to ensure the normal operation of the air-conditioning system. The construction team first carried out an airtightness pressure test using nitrogen to pressure test the system and check whether there was any leakage in the piping system. After passing the test, they used a vacuum pump to vacuum-dry the system, removing air and moisture from the system. Then, according to the refrigerant charging requirements of the outdoor unit, they used professional refrigerant charging equipment to charge the refrigerant into the system. After the charging was completed, they turned on the power, started up the multi-connected air-conditioning system, and checked the operating status of the indoor and outdoor units, including the working condition of the compressor, fan, electronic expansion valve and other components. After a series of strict debugging and testing, the system reached the ideal working condition. Finally, the construction team checked and accepted the whole system to ensure that the quality of the installation was in line with the specifications and design requirements
Second, the significance of the project
Demonstration of technical strength
The successful implementation of this multi-connected air-conditioning installation project fully demonstrates the technical strength and professionalism of Henan Aibo Trading Co. From the construction preparation to system commissioning, each link is carried out in strict accordance with the specifications and requirements to ensure the successful completion of the project. This not only enhances the competitiveness of the company in the domestic market, but also establishes a good brand image for the company in the international market.
Advancement of internationalization strategy
This project is an important step in the company's internationalization strategy. Through the cooperation with an amusement park in the Philippines, the company not only expanded its overseas market, but also accumulated valuable experience in international projects. This has laid a solid foundation for the company's further expansion in the international market in the future.
Promoting economic and trade cooperation between China and the Philippines
The successful implementation of this project also promotes the economic and trade cooperation between China and the Philippines. By providing high-quality products and services, Henan Able Trading Co., Ltd. has won the trust and recognition of customers in the Philippines. This not only helps to promote trade between the two countries, but also injects new vitality into the economic cooperation between the two countries.
Enhancement of amusement park visitors' experience
For an amusement park in the Philippines, the installation of the multi-connected air-conditioning system will greatly enhance the visitors' playing experience. In the hot weather, visitors can play in a comfortable environment and enjoy a good time. This will not only help to enhance the popularity and reputation of the amusement park, but will also bring more visitors and revenue to the amusement park.
To summarize, the successful implementation of the project of installing multi-connected air-conditioning units for an amusement park in the Philippines by Henan Ai Bo Trading Co. It not only demonstrates the company's technical strength and professionalism, but also promotes the company's internationalization strategy; at the same time, it promotes the economic and trade cooperation between China and the Philippines, and improves the experience of visitors to the amusement park. We believe that in the future, Henan Aibo Trade Co., Ltd. will continue to uphold the spirit of professionalism and innovation, and provide customers with more high-quality products and services.
Back